ČAMINSKI logoČAMINSKIEngineering Advisory & Project Delivery
Scope of work
01 / ROBOTICS & INTRALOGISTICS

Robotics systems & intralogistics

  • AMR/AGV solution architecture
  • industrial material-flow and automation feasibility assessments
  • requirements analysis and robot selection
  • fleet deployment and system integration
  • supplier coordination
  • project planning and risk management
  • technical pre-sales and business-case development
  • FAT/SAT, commissioning, handover and post-deployment optimization
02 / INDUSTRIAL COMMISSIONING

Packaging, palletizing & end-of-line automation

  • International deployment of high-speed packaging machinery
  • robotic palletizing and end-of-line integration
  • installation planning and production ramp-up
  • cross-functional engineering and commissioning coordination
  • FAT/SAT execution
  • fault diagnosis, performance validation, operator training and operational handover
03 / TECHNICAL CONSULTING

SMT/SMD production & inspection technology

  • Production needs assessment and technical requirements
  • SMT/SMD equipment and inspection technology evaluation
  • technical product demonstrations
  • solution configuration and comparison
  • technical-commercial proposals
  • customer training, supplier coordination and technology benchmarking
04 / CNC AUTOMATION DELIVERY

CNC laser & plasma project implementation

  • CNC laser and plasma cutting technology implementation
  • multi-site equipment deployment
  • technical project planning, scheduling and resource coordination
  • integration and commissioning
  • supplier/engineering alignment
  • acceptance processes
  • manufacturing workflow modernization and operator handover
05 / FIELD ENGINEERING

Industrial machinery service & optimization

  • Installation, calibration and commissioning of CNC systems
  • preventive and corrective maintenance
  • electrical and mechanical diagnostics
  • cutting-process optimization
  • reliability improvements and downtime troubleshooting
  • on-site support, training and service documentation
06 / MANUFACTURING ENGINEERING

Automotive production & process improvement

  • Automotive cable-harness production support
  • workflow and bottleneck analysis
  • Lean Manufacturing and 5S
  • quality control and process standardization
  • start-of-production readiness
  • coordination with manufacturing and quality teams
  • material-flow improvements and OEM compliance
07 / DIGITAL OPERATIONS

Enterprise IT, ERP/WMS & logistics systems

  • Multi-site IT operations and infrastructure
  • ERP deployment and WMS integration
  • warehouse inventory and order-fulfilment workflow improvement
  • POS and network reliability
  • business-process digitalization
  • cross-location systems rollout and technical continuity support

The following describes areas of professional experience. No customer names, confidential details or unverified performance figures are published.